Manufacturing and supply chain: shop-floor visibility, maintenance and vendor integration

How to see the shop floor in real time, plan maintenance before breakdown with Field Service, and connect suppliers.

← All thought leadership
Industry blueprint For COOs, plant directors, supply chain directors
The short answer

Visibility comes from capturing production events where they happen. Connect machines and operators to the order, and planning, costing and maintenance start from the same truth.

Stages

Order to shipment with live visibility

  1. 1
    الخطة Demand and capacity plans create production orders with the bill of materials and routes.
  2. 2
    Execute Operators and machines report start, stop, scrap and output on the shop floor.
  3. 3
    الحفاظ على Asset condition and maintenance history trigger work orders before a breakdown.
  4. 4
    Collaborate with vendors Purchase orders, confirmations and ship notices flow through integration.
  5. 5
    Cost and ship Actual cost posts to the order and shipment completes the cycle.
Decision points

Three questions that change the answer

Can the machine report its own events?

YesIntegrate the machine data to the order.

NoUse operator terminals for capture.

Is downtime expensive?

YesPrioritise condition-based maintenance for those assets.

NoUse scheduled preventive maintenance.

Are suppliers already digital?

YesIntegrate electronically.

NoUse a supplier portal.

Milestones

What done looks like, and when

  1. Month 1 to 3 Master data, bills of materials and routes designed.
  2. Month 4 to 6 Shop-floor capture live on a pilot line.
  3. Month 7 to 9 Maintenance and vendor integration live.
  4. Steady state Actual versus planned cost reviewed each period.
Principles we hold to
  • Capture events where they happen.
  • Plan, cost and maintain from one truth.
  • Start with one line.
  • Suppliers join through a portal or an integration.

الأسئلة الشائعة

How does Dynamics 365 give shop-floor visibility?

Production events are reported against the order from terminals or machines, so progress, scrap and cost are visible as the work happens.

Can Dynamics 365 predict maintenance?

Condition data and history can trigger work orders in Field Service before a failure. How early depends on the sensors and history available.

Take this to your own programme. Tell us where you are. We will tell you plainly what this means for your estate and what we would do first. احجز استشارة Next: Financial services and healthcare: secure portals, self-service and automated claims or loans →
كيف تدار العلاقة

يبدأ باستشارة مدتها 45 دقيقة، ثم ورشة اكتشاف وورشة عمل حول عملياتك الخاصة. تحصل على فجوة ملاءمة مكتوبة وخطة مرحلية قبل الاتفاق على البرنامج. تتبع أربع مراحل، كل منها يحتوي على شيء يمكنك استخدامه ومراجعته.

01

اكتشف

ورش عمل للعمليات، تدقيق البيانات، وفجوة ملاءمة مع المنتج القياسي.

02

التصميم

مخطط الحل، خريطة التكامل، والإضافات التي سنحتاجها فعليا.

03

النشر

التكوين، تدريب الهجرة، التدريب القائم على الأدوار، التدريبات غير المدرجة، والانتقال التدريجي.

04

الدعم

هايبركير، الخدمات المدارة، بوابة العملاء، مراجعات التحسين المجدولة.

ما الذي يدفع التكلفة: المستخدمون، الكيانات القانونية والعملات، التكاملات، ترحيل البيانات والفجوات التي تم العثور عليها مقارنة بالمعايير المعتادة. شاهد كيف يعمل التسعير، قم بقياس درجة الجاهزية لمدة ثلاث دقائق، أو احجز موعد استشارة.

دعونا نتحدث عن الحلول.

خطط لخارطة طريق ERP CRM مع خبرائنا.

احجز استشارة قدر عائدك
اتصل احجز استشارة
Software Dynamics
عادة ما يرد خلال ساعات العمل الأسترالية (AEST/AEDT)
مرحبا. ماذا تحاول حل؟ اختر واحدا وسنقوم بتوجيهك إلى الشخص المناسب. أريد أن أرى عرضا توضيحيا أنا عميل قائم وأحتاج إلى دعم حدثني عن الفوترة الإلكترونية