Cette page est traduite automatiquement. La version anglaise fait foi. English
Phase 1 · Sensibilisation Enterprise architecture and ecosystem integration

Clean core and dual-write: extending Dynamics 365 without breaking the upgrade path

How to extend Finance and Operations and Dataverse with the Power Platform and Azure while keeping every update a routine event, not a project.

← All thought leadership
Reference architecture For CIOs, enterprise architects, IT directors
La réponse courte

Keep the core standard, build around it, and connect through documented interfaces. Every extension should answer one question: what does this cost us at the next update?

Stages

The extension ladder

  1. 1
    Configure Use setup, workflow, security and personalisation first. Nothing to maintain at update time.
  2. 2
    Compose Use Power Platform, Power Automate and Power BI around the system, on Dataverse, with the platform's own connectors.
  3. 3
    Integrate Use Azure services, business events and APIs to talk to other systems, with a visible failure path.
  4. 4
    Extend Write an extension only where the product stops, using extension points and never overlayering.
  5. 5
    Retire Review extensions at every release wave and remove what the product now does as standard.
Decision points

Three questions that change the answer

Can standard configuration do it?

YesConfigure it. Stop here.

NoMove down the ladder.

Does it need to run outside the ERP?

YesCompose it on the Power Platform or Azure and integrate through an API.

NoConsider a small extension in the ERP.

Do two systems need the same record in near real time?

YesUse dual-write for the shared tables and own the sync errors.

NoUse a scheduled or event-driven integration instead.

Milestones

What done looks like, and when

  1. Conception Extension register opened: every extension has an owner and a cost at update.
  2. Build Extensions use extension points. No overlayering.
  3. Each update wave Regression tests run on a copy, and extensions are re-justified.
  4. Yearly Extension register reviewed and trimmed.
Principles we hold to
  • Configure first, extend second, and customise last.
  • Every extension has an owner and an update cost.
  • Dual-write is for shared master data that must agree, not for every table.
  • Update waves are routine because the core is standard.

Questions fréquemment posées

What is a clean core in Dynamics 365?

A standard system that is extended only through supported extension points and companion services, so Microsoft updates apply without rework.

When should we use dual-write?

When the same business record, such as a customer or product, must stay in step between Finance and Operations and Dataverse applications, and you are prepared to own the sync monitoring.

Take this to your own programme. Tell us where you are. We will tell you plainly what this means for your estate and what we would do first. Prenez rendez-vous pour une consultation Next: Legacy ERP migration: Dynamics AX, SAP and Dynamics GP to cloud-native Dynamics 365 →
Comment se déroule un engagement

Cela commence par une consultation de 45 minutes, puis une découverte et un atelier d’ajustement sur vos propres processus. Vous recevez un programme écrit d’ajustement et un plan par étapes avant qu’un programme ne soit approuvé. Quatre phases suivent, chacune avec un outil que vous pouvez utiliser et revoir.

01

Découvrir

Ateliers de procédés, audit des données, et un écart d’adéquation avec le produit standard.

02

Conception

Plan de solution, carte d’intégration, et les extensions dont nous aurons réellement besoin.

03

Déploiement

Configuration, répétitions de migration, formation basée sur les rôles, UAT et transition progressive.

04

Soutien

Hypercare, services managés, portail client, évaluations d’optimisation programmée.

Ce qui détermine le coût : utilisateurs, entités juridiques et devises, intégrations, migration des données et les lacunes rencontrées par rapport aux standards. Découvrez comment fonctionne la tarification, effectuez le score de préparation en trois minutes, ou prenez rendez-vous pour une consultation.

Parlons des solutions.

Planifiez votre feuille de route ERP CRM avec nos experts.

Prenez rendez-vous pour une consultation Estimez votre rendement
Appel Prenez rendez-vous pour une consultation
Software Dynamics
Répond généralement pendant les heures ouvrables australiennes (AEST/AEDT)
Bonjour. Qu’essayez-vous de résoudre ? Choisissez-en un et nous vous orienterons vers la bonne personne. Je veux voir une démo Je suis un client existant et j’ai besoin de soutien Parlez-moi de la facturation électronique